The push is on to be ready for the new high-speed quad chairlift. The "Gold Corp Express" is currently in route to Terry Peak. So, the crew has been busy conturing the bottom of the Inferno run to host the final resting place for the new lift's bottom terminal and load area. The base of the new chairlift will be located on the opposite side of the Inferno run, opposite from where the Red Chair load area was.
There are no comments at this time.